<nav id="7jtmj"><tt id="7jtmj"></tt></nav>
    <sub id="7jtmj"></sub>
  • 亚洲性爱综合网_少妇人妻一级黄色片无码_久久亚洲AⅤ无码_中国成人A级黄色毛片

    Contact Us

    Cross Flow Fan Installation and maintenance requirements

    Date: 2016-5-13   Click: 1811 Times

    1, "Cross Flow Fan" ambient temperature should be 75ºC ≥ -40ºC.
    2, industrial gas through the cooling fan does not allow strong acid, alkali and various solutions.
    3, does not allow dust and other debris fall into the fan, so as to avoid burning and fan blades break.
    4, "Cross Flow Fan" before installation should first check whether the damage caused due to packing and shipping, deformation, if damaged or deformed should be repaired after installation.
    5, and then check the "Cross Flow Fan" all parts and screws are loose; whether touching or displacement between the blade and duct before installation if the touching or the shift should be adjusted. To replace the fan products from different manufacturers, you need to measure fan site size holes.

    Back to: Industry news

    +86-0769-83660708

    Home Product News Contact

    亚洲性爱综合网_少妇人妻一级黄色片无码_久久亚洲AⅤ无码_中国成人A级黄色毛片
    <nav id="7jtmj"><tt id="7jtmj"></tt></nav>
    <sub id="7jtmj"></sub>